Skip to content

Mina La Ponderosa 1 al 8

MineCobrePetorca, ValparaísoActive

Site ID 20183467 · 10 installations in the register

Installations

What the register lists at this site, grouped by function.

3Extraction3Dumps and deposits

Extraction3

NameTypeStatusElevationCoordinatesSERNAGEOMIN
Mina La Ponderosa 1 al 8Underground mineActiva1,809 m a.s.l.-32.0701, -70.9700SERNAGEOMIN
Socavon InferiorUnderground mineActiva1,795 m a.s.l.-32.0693, -70.9706SERNAGEOMIN
Socavon SuperiorUnderground mineActiva1,816 m a.s.l.-32.0701, -70.9707SERNAGEOMIN

Dumps and deposits3

NameTypeStatusElevationCoordinatesSERNAGEOMIN
BotaderoWaste rock dumpActiva1,802 m a.s.l.-32.0691, -70.9708SERNAGEOMIN
Botadero 2019Waste rock dumpActiva1,795 m a.s.l.-32.0689, -70.9706SERNAGEOMIN
Piscina DecantadoraWaste rock dumpActiva1,797 m a.s.l.-32.0689, -70.9714SERNAGEOMIN

Support4

NameTypeStatusElevationCoordinatesSERNAGEOMIN
CombustiblesWarehouseActiva1,784 m a.s.l.-32.0685, -70.9714SERNAGEOMIN
Residuos IndustrialesWarehouseActiva1,784 m a.s.l.-32.0685, -70.9709SERNAGEOMIN
CampamentoCampActiva1,784 m a.s.l.-32.0649, -70.9713SERNAGEOMIN
PolvorinExplosives magazineActiva1,808 m a.s.l.-32.0702, -70.9700SERNAGEOMIN

Deposits nearby

Deposits and prospects of SERNAGEOMIN's national database within 15 km of this operation, nearest first.

  • Esperanza· Au, Ag, Cu (Mo)· 1.4 km awaySERNAGEOMIN

    Small · Mined

    • Resource: Medido: 100000 t · 1994
    • Resource: Medido: 4500 t · 4,2 % Cu ; 10 g/t Au ; 43 g/t Ag
    • Resource: Indicado: 17000 t · 2,7 % Cu ; 3 g/t Au
  • Ximenita· Au, Cu, Ag· 1.6 km awaySERNAGEOMIN

    Small · Mined

    • Reserve: 23000 t · 0,92 % CuT ; 19 g/t Ag
  • Santa Ana· Cu, Au· 1.7 km awaySERNAGEOMIN

    Small · Mined

    • Resource: 5000 t · 1,6 % CuI ; 3 g/t Au ; 15 g/t Ag
  • Existe· Au, Ag, Cu· 1.9 km awaySERNAGEOMIN

    Small · Mined · Epitermal de Intermedia Sulfuración

    • Resource: 10000 t · 2,5 g/t Au
    • Resource: 10000 t · <1 % CuT ; <1 g/t Au
  • Tesoro del Inca 1 al 20· Cu, Au· 1.9 km awaySERNAGEOMIN

    Small · Mesotermal de Cu-Au

    • Reserve: 7356 t (3107 t mineral) · 2015
  • El Llano· Cu, Au, Ag· 1.9 km awaySERNAGEOMIN

    Small · Mined · Epitermal de Intermedia Sulfuración

    • Resource: 17000 t · 2,2 % CuT ; 1 g/t Au ; 12 g/t Ag
    • Resource: 30000 t · 2,7 % CuT ; 3 g/t Au ; 27 g/t Ag
    • Resource: 30000 t · 1,57 % CuT ; 4,7 g/t Au ; 18 g/t Ag
  • Sin Nombre· Cu· 2.1 km awaySERNAGEOMIN

    Small · Mined

  • Paloma· Cu, Ag· 2.1 km awaySERNAGEOMIN

    Small · Mined

  • Doña Herminda· Au· 2.2 km awaySERNAGEOMIN

    Small

  • Las Negras· Au, Cu, W· 2.3 km awaySERNAGEOMIN

    Small · Mined

    • Reserve: 11869 t total (10362 t de mineral) · 2015
  • Sin Nombre· Cu· 2.4 km awaySERNAGEOMIN

    Small · Mined

  • Isadora· Cu, Au, Ag (Zn)· 2.4 km awaySERNAGEOMIN

    Small · Mined · Epitermal de Intermedia Sulfuración

    • Reserve: 2050 t total (1160 t mena cuprífera) · 2015

Source: SERNAGEOMIN, national deposit database (SIA Yacimientos). Referential: the distance is between points and does not say who owns each deposit. Every deposit in the country is on Deposits.