Skip to content

Operations

Mining operations in Chile

The 39 operations with published output, ordered by fine copper in the 12 months to July 2026. Each has its own page: output month by month since 2014, by year since 2000, and its projects.

Together 5,041.7 kt: 97.5% of the 5,170.8 kt the country produced.

Operations by copper output
Operation24 monthsCopper, 12 monthsChangeShare of ChileMolybdenum, 12 monthsSMA recordsProjectsSource
1Escondida1,271.6 kt5.91%24.59%—306Cochilco
2Collahuasi405.7 kt10.11%7.85%1,254 t252Cochilco
3Radomiro Tomic307.1 kt8.31%5.94%—111Cochilco
4Los Pelambres299.4 kt5.42%5.79%11,147 t742Cochilco
5El Teniente256.5 kt33.19%4.96%2,632 t641Cochilco
6Chuquicamata225.5 kt17.37%4.36%—711Cochilco
7Spence213.9 kt18.3%4.14%887 t82Cochilco
8Quebrada Blanca209 kt1.03%4.04%2,784 t26—Cochilco
9Andina190.7 kt12.62%3.69%1,905 t158—Cochilco
10Los Bronces178.1 kt14.63%3.44%—223Cochilco
11Sierra Gorda162 kt2.85%3.13%3,845 t63Cochilco
12Centinela Sulfuros160.7 kt2.32%3.11%———Cochilco
13Caserones140.1 kt15.85%2.71%1,966 t19—Cochilco
14Ministro Hales124.8 kt24.12%2.41%—32—Cochilco
15Candelaria118.1 kt19.84%2.28%—221Cochilco
16Mantoverde91 kt1.48%1.76%—112Cochilco
17El Abra82.5 kt17.57%1.6%—72Cochilco
18Gabriela Mistral79.4 kt8.63%1.54%—3—Cochilco
19Zaldívar78.5 kt5.52%1.52%—81Cochilco
20Antucoya77.6 kt1.78%1.5%—4—Cochilco
21Lomas Bayas58.5 kt11.45%1.13%—61Cochilco
22Centinela Óxidos56.9 kt33.37%1.1%———Cochilco
23Mantos Blancos56.5 kt1.78%1.09%—5—Cochilco
24Carmen de Andacollo53.2 kt12.58%1.03%—173—Cochilco
25Salvador48.2 kt77.83%0.93%—1001Cochilco
26El Soldado39.3 kt14.64%0.76%—9—Cochilco
27Michilla15 kt17.16%0.29%—111Cochilco
28Ojos del Salado (Lundin)Group11.5 kt33.19%0.22%—8—Cochilco
29Atacama Kozan10.2 kt11.83%0.2%—7—Cochilco
30Franke9.6 kt17.64%0.18%—4—Cochilco
31Cerro Negro4.3 kt10.91%0.08%—5—Cochilco
32Pampa Camarones (mina y planta de cátodos)Group3.9 kt9.67%0.08%—11—Cochilco
33Tres Valles2 kt62.64%0.04%—721Cochilco

Fine copper in thousand tonnes (kt) and molybdenum in tonnes (t), at 100% of each operation, from Cochilco's monthly table. The change compares with the twelve months before. The share is of the total the same table prints. The SMA records and the projects are those already tied to the operation: a dash means there is no link yet, not that there are none.

Without a monthly copper figure

Operations the monthly table does not list separately, that the source reports as a group, that produce molybdenum only, or that stopped producing.