Company profile
Hidroelectrica Dos Valles SpA
RUT 76.495.341-KGeneración de Energía Eléctrica en Centrales Hidroelectricas
Hidroelectrica Dos Valles SpA (RUT 76.495.341-K) holds 6 water use rights in the DGA register, in Libertador General Bernardo O'Higgins. Dirección General de Aguas…
Water rights
Dirección General de Aguas…DGA register of water use rights.
6
current rights in its name
- 6 non-consumptive: 5,091.2 l/s declared in total
By region: Libertador General Bernardo O'Higgins (6)
Flows are those the register declares, added by type; the DGA warns that the register does not replace the case file.
Lobbying meetings
InfoLobby, Ley 20.730Meetings recorded in InfoLobby (Law 20,730) it took part in.
31
meetings since Feb 21, 2023
- SEA22
- DGA4
- DPR Metropolitana2
- Subsecretaría del Medio Ambiente2
- Subsecretaría de Economía1
Counts by institution; officials' names are not published.
Mining patents
TGRTreasury register of mining-concession patents, file of October 2026.
8
concessions with a patent
$6,098,516
to pay in the period
21 payment forms in the file.
Frequently asked questions about Hidroelectrica Dos Valles SpA
Answers built from the same figures as this page, each with its source.
- What is the RUT of Hidroelectrica Dos Valles SpA?
- The RUT of Hidroelectrica Dos Valles SpA is 76.495.341-K; its registered name at the SII is HIDROELECTRICA DOS VALLES SPA. Its main activity, per the SII, is generación de energía eléctrica en centrales hidroelectricas. SIISII
- Does Hidroelectrica Dos Valles SpA hold water rights?
- Yes. The DGA register of water use rights lists 6 water use rights held by Hidroelectrica Dos Valles SpA: 6 non-consumptive (5,091.2 l/s), in Libertador General Bernardo O'Higgins. Dirección General de Aguas…
- Which authorities has Hidroelectrica Dos Valles SpA met through lobbying?
- InfoLobby records 31 lobbying meetings in which Hidroelectrica Dos Valles SpA took part since Feb 21, 2023, mostly with SEA (22), DGA (4) and DPR Metropolitana (2). InfoLobby, Ley 20.730
- Does Hidroelectrica Dos Valles SpA pay mining patents?
- Yes. The Treasury (TGR) file of October 2026 lists the patent of 8 mining concessions under Hidroelectrica Dos Valles SpA, with $6,098,516 to pay. TGR
Every figure is a count or a sum of the records of the cited source under this legal person (by its RUT or its name as verified with the SII); the icon opens the original document. Lobbying meetings are shown seven days late. Natural persons have no profile.
What you will see about Hidroelectrica Dos Valles SpA when you sign up
The company's full profile inside Veta IQ, every record with its source.
- Its 6 water rights, with flow and resolution date per the DGA register
- Its 31 lobbying meetings by institution and year, and the latest with their subject
- Its mining patents (8 concessions): what is due, paid and owed by period
- Email alerts when something new about this company appears
- The AI assistant, which answers with the source of every figure (15 credits in the trial)
- Export to Excel (3 exports in the trial)
No card and no automatic renewal.
Ask the assistant about Hidroelectrica Dos Valles SpA
Pick a question: it is written in the assistant when you come in, and you decide when to send it. Every answer gives the source of each figure.
- Which institutions has Hidroelectrica Dos Valles SpA met through lobbying, and about what?
- Which water rights does Hidroelectrica Dos Valles SpA hold, and for what flow?
- How much does Hidroelectrica Dos Valles SpA pay in mining patents, and does it owe any balance?
You need an account; the trial includes 15 credits.
Follow Hidroelectrica Dos Valles SpA
Try free