Overlapping mining concessions in Chile: priority, opposition and nullity
It is decided on two levels: priority by the date of the request, which obliges a holder to oppose in time, and nullity of the later concession, time-barred four years after the extract is published.
Priority obliges you to oppose
If a later manifestante requests the survey before the earlier one, the earlier one loses preference by not opposing in time. A holder of an earlier pedimento or exploration concession who does not bring the action of art. 61 no. 1 loses their rights over the ground where the pertenencia is constituted (art. 65). In that case the defendant can only argue that their request does not cover that ground; anything else goes in a separate case (art. 68).
The grounds for nullity
Art. 95 is an exhaustive list. For overlaps these matter:
- No. 6: a pertenencia on ground covered by another survey presumed to be earlier.
- No. 7: a pertenencia on ground already covered by another pertenencia.
- No. 8: an exploration concession on ground of another whose pedimento is earlier.
Time bar and cure
Actions under nos. 1 to 7 are time-barred four years after the extract of art. 90 is published. After that the concession is cured of any defect. When the action under no. 6 or 7 is barred, the judgment also ends the pertenencia affected by the overlap, and the concession of the person who held the action survives in the part that does not overlap. The action under no. 8 ends another way: by not bringing the opposition of art. 61 no. 1 (art. 96).
Other limits
Someone who opposed on the second ground of art. 61 and lost cannot later claim nullity under nos. 6 or 7 (art. 67). An annulled concession allows correcting the request or the plan, without leaving the original perimeter and except for fraud or wilful misconduct (art. 98).
What a map shows
The cadastre's polygons are for reference, so two neighbours can cross through a drawing or datum error. A crossing on the map is a signal to check the titles. It does not by itself prove a legal overlap.
See it in the data
Rules reviewed
- Código de Minería, arts. 61, 65, 67, 68, 90, 95, 96 and 98
Reviewed on Nov 2, 2026, against the text in force on that date.
These guides are general information and not legal advice. Before deciding, check the text in force and your case file, or consult a lawyer.