Metallic mining
Modificaciones Proyecto Antucoya
Minera Antucoya Limitada — Antofagasta
Approval
2015
RCA 351/2015 · Aprobado
Site
Antucoya
8 environmental approvals at this site
File
- Instrument
- —
- Project type
- Metallic mining
- Company
- Minera Antucoya Limitada
- Comunas
- Antofagasta
- Assessed in
- Antofagasta
- Coordinates
- -22.6546, -69.8571
- Site in the register: Antucoya
Timeline
The register gives only the year of the approval: 2015.
Enforcement at the site
- Inspections4 · latest in 2023
These cover the whole site, not this project alone.
Other approvals at Antucoya
7 more approvals at the same supervised unit.
| Project | Approval | Declared investment | Source |
|---|---|---|---|
| Plan de Adecuación Operacional en Depósito de Ripios Antucoya | 2020RCA 280/2020 | — | SMA |
| Modificaciones II - Minera Antucoya | 2019RCA 0017/2019/2019 | — | SMA |
| Transporte de Ácido Sulfúrico Antucoya | 2015RCA 433/2015 | — | SMA |
| Línea de Transmisión Eléctrica Minera Antucoya | 2014RCA 101/2014 | — | SMA |
| Planta de Producción de Ácido Sulfúrico Antucoya | 2012RCA 136/2012 | — | SMA |
| Proyecto Antucoya | Jul 15, 2011EIA · RCA 128/2011 | US$ 950 M | SMA |
| Aseguramiento Parametros Metalurgicos Antucoya | Mar 1, 2010DIA · RCA 61/2010 | US$ 8 M | SMA |
Source: public register of environmental approvals. This register states neither the investment nor the day of the resolution; the location is the site's.