Projects
Projects with environmental approval
1,452 mining projects with an environmental approval (RCA), out of 2,298 approvals at supervised sites of the sector. Each with its date, instrument, declared investment, company and location.
Projects in this selection
1,452
RCAs from 1992 to 2026
Declared investment
US$ 94,035 M
Sum of the 824 projects that state it, in nominal dollars of each evaluation year
Regions
16
Antofagasta 532 · Atacama 352 · Coquimbo 138
Approvals per year
Number of RCAs in the selection by the year they were issued.
1,452 projects
| Project | Company | Location | Approval | Declared investment | Source |
|---|---|---|---|---|---|
| Continuidad Operacional Planta El Salado - ENAMIMetallurgy · Planta Salado ENAMI | ENAMI | Atacama | 2021RCA 164/2021 | — | SMA |
| Mejoramiento Operacional Depositación Relaves Planta Manuel Antonio Matta ENAMIMetallurgy · Planta Matta ENAMI | ENAMI | Atacama | 2021RCA 20210300171/2021 | — | SMA |
| Depósito de Ripios y Cobertura Superficial del Tranque de Relaves Planta José Antonio Moreno ENAMI - TaltalMetallurgy · Ripios de Lixiviación Planta Taltal | ENAMI | Antofagasta | 2021RCA 303/2021 | — | SMA |
| Proyecto Alternativo Depositación de Relaves en RajoMetallic mining · Minera Centinela | Minera Centinela | Antofagasta | 2021RCA 20210200196/2021 | — | SMA |
| Seccionamiento Línea 2X220 KV El Cobre ? Esperanza y Adecuaciones en S/e CentinelaMetallic mining · Minera Centinela | — | Antofagasta | 2021RCA 20210200198/2021 | — | SMA |
| Implementación de Nuevas Obras ElectricasMetallic mining · Minera Escondida | Minera Escondida | Antofagasta | 2021RCA 20210200177/2021 | — | SMA |
| Depósito de Relaves Filtrados Planta de PelletsMetallurgy · CMP-Planta Pellets | Cía. Mra. del Pacífico S.A. | Atacama | Nov 18, 2021RCA 20210300158/2021 | — | SMA |
| Tente en el AireNon-metallic mining · Faena Nueva Victoria - SQM | SQM | Tarapacá | Nov 5, 2021RCA 20210100112/2021 | — | SMA |
| Proyecto Polo Sur y Optimización Minera CentinelaMetallic mining · Minera Centinela | Minera Centinela | Antofagasta | Jul 13, 2021RCA 267/2021 | — | SMA |
| Actualizaciones de Ingeniería y Construcción Obras 7ª 8ª y 9ª Etapas Peraltamiento Embalse CarenMining | Codelco | Metropolitana de Santiago | Jun 25, 2021RCA 44/2021 | — | SMA |
| Actualización Proyecto Minero División Radomiro TomicMetallic mining · Radomiro Tomic | Codelco | Antofagasta | Mar 29, 2021RCA 121/2021 | — | SMA |
| Continuidad Operativa Tranque de Relaves El Torito Operación El SoldadoMetallic mining · Mina El Soldado | Anglo American Sur | Valparaíso | 2020RCA 2/2020 | — | SMA |
| Continuidad Operacional Mina Dos AmigosMetallic mining · Dos Amigos | — | Atacama | 2020RCA 4/2020 | — | SMA |
| Proyecto Minero 3HMining | — | Valparaíso | 2020RCA 20/2020 | — | SMA |
| Optimización Proyecto Planta NoraMetallic mining · Minera Trinidad | Sociedad Contractual Minera Berta | Atacama | 2020RCA 35/2020 | — | SMA |
| Actualización de Manejo de Ripios de Lixiviación - SpenceMetallic mining · Spence | Minera Spence S.A. | Antofagasta | 2020RCA 53/2020 | — | SMA |
| Nuevo Relaveducto y Sistema de Transmisión Eléctrica Sector Tranque de Relaves Laguna SecaMetallic mining · Minera Escondida | Minera Escondida | Antofagasta | 2020RCA 63/2020 | — | SMA |
| Explotación Fase II Mina Dona ElbaMetallic mining · Explotación de Minerales Doña Elba | Minera Las Cenizas S.A. | Antofagasta | 2020RCA 84/2020 | — | SMA |
| Actualización de los Requerimientos de Materiales Asociados a la Construcción Diferida del Depósito de RelavesMetallic mining · Spence | Minera Spence S.A. | Antofagasta | 2020RCA 64/2020 | — | SMA |
| DIA Mejora Ambiental DLC IIMetallurgy · Pucobre-Planta San José | Sociedad Punta del Cobre S.A. | Atacama | 2020RCA 60/2020 | — | SMA |
| Ajustes Operacionales para MCHSMetallic mining · Codelco Chuquicamata | Codelco | Antofagasta | 2020RCA 139/2020 | — | SMA |
| Aumento Movimientos MinaMetallic mining · Ministro Hales | Codelco | Antofagasta | 2020RCA 235/2020 | — | SMA |
| Mina San AntonioMining | Cía. Mra. San Gerónimo | Coquimbo | 2020RCA 116/2020 | — | SMA |
| Continuidad Operacional Teck CdaMetallic mining · Teck Carmen de Andacollo | Teck Carmen de Andacollo | Coquimbo | 2020RCA 169/2020 | — | SMA |
| Modificación IV Planta de Óxidos TaltalMetallurgy · Planta de Óxidos Taltal | Minera Las Cenizas S.A. | Antofagasta | 2020RCA 281/2020 | — | SMA |
| Plan de Adecuación Operacional en Depósito de Ripios AntucoyaMetallic mining · Antucoya | Minera Antucoya Limitada | Antofagasta | 2020RCA 280/2020 | — | SMA |
| Optimización Operacional Mina Uva SubterráneaMetallic mining · Proyecto Minero Uva | Soc. Exploración y Desarrollo Minero (Explodesa) | Valparaíso | 2020RCA 29/2020 | — | SMA |
| Prospección McalMining | — | Antofagasta | 2020RCA 279/2020 | — | SMA |
| Cambio Planta DesalinizadoraMetallic mining · Minera Metálicasanto Domingo | Minera Santo Domingo SCM | Atacama | Nov 20, 2020RCA 122/2020 | — | SMA |
| Rajo IncaMetallic mining · Codelco Salvador - Potrerillos | Codelco | Atacama | Feb 28, 2020RCA 19/2020 | — | SMA |
| Proyecto BlancoMining | Minera Salar Blanco S.A. | Atacama | Feb 4, 2020RCA 94/2020 | — | SMA |
| Proyecto Diego de Almagro Sur 1Metallic mining · Minera Metálicadiego de Almagro - Sierra Norte | — | Atacama | 2019RCA 132/2019 | — | SMA |
| Proyecto Diego de Almagro Sur 2Metallic mining · Minera Metálicadiego de Almagro - Sierra Norte | — | Atacama | 2019RCA 133/2019 | — | SMA |
| Adecuación Obras Mineras de Andina para Continuidad Operacional ActualMetallic mining · Codelco - División Andina | Codelco | Valparaíso | 2019RCA 1066/2019 | — | SMA |
| Botadero de Lastre Cerro TurquesaMetallic mining · El Abra | SCM El Abra | Antofagasta | 2019RCA 87/2019 | — | SMA |
| Adecuaciones en Depósitos de Lastre Caminos Internos y CampamentoMetallic mining · Faena Minera Cerro Colorado | Compañía Minera Cerro Colorado Limitada | Tarapacá | 2019RCA 11/2019 | — | SMA |
| Continuidad Operacional Proyecto IntegraciónMetallic mining · Minera Centinela | Minera Centinela | Antofagasta | 2019RCA 0016/2019/2019 | — | SMA |
| Optimización Planta Tratamiento Minerales en Pila (PTMP)Metallic mining · Codelco Chuquicamata | Codelco | Antofagasta | 2019RCA 66/2019 | — | SMA |
| Modificaciones II - Minera AntucoyaMetallic mining · Antucoya | Minera Antucoya Limitada | Antofagasta | 2019RCA 0017/2019/2019 | — | SMA |
| Actualización Proyecto Desarrollo Minera CentinelaMetallic mining · Minera Centinela | Minera Centinela | Antofagasta | 2019RCA 58/2019 | — | SMA |
| Prospección Minera Norte Abierto Sector CaspicheMining | Sociedad Norte Abierto SpA | Atacama | 2019RCA 9/2019 | — | SMA |
| Manejo de Aguas Naturales Antes de Botaderos MinaMetallic mining · Minera Los Pelambres | Minera Los Pelambres | Coquimbo | 2019RCA 115/2019 | — | SMA |
| Ampliación de la Planta de Carbonato de Litio a 180.000 Ton/AñoNon-metallic mining · SQM Salar Atacama | NovaAndino Litio (ex SQM Salar) | Antofagasta | 2019RCA 57/2019 | — | SMA |
| Modificación Parcial Trazado Tuberia del Sistema de Transporte de Pulpa STP 24 (114 KM)Metallic mining · Los Bronces - Anglo American Sur S.A. | Anglo American Sur | Metropolitana de Santiago | 2019RCA 664/2019 | — | SMA |
| Subestación CentinelaMetallic mining · Minera Centinela | — | Antofagasta | 2019RCA 56/2019 | — | SMA |
| Explotación Mina VerdeMining | — | Coquimbo | 2019RCA 73/2019 | — | SMA |
| Recuperación de Mineral de Cobre Desde Botaderos Venado SurMetallic mining · Pucobre-Venado Sur | Sociedad Punta del Cobre S.A. | Atacama | 2019RCA 28/2019 | — | SMA |
| Plan Integral de Sondajes Exploratorios DMH 2019 - 2029Metallic mining · Ministro Hales | Codelco | Antofagasta | 2019RCA 44/2019 | — | SMA |
| Cese de la Descarga de Relaves en Ensenada ChapacoMetallurgy · CMP-Planta Pellets | Cía. Mra. del Pacífico S.A. | Atacama | 2019RCA 120/2019 | — | SMA |
| Continuidad Operacional El PenonMetallic mining · El Peñón | — | Antofagasta | 2019RCA 168/2019 | — | SMA |
Source: public registers of Chile's environmental regulator (SMA). Investment is what the holder declared when the project was assessed, in dollars of that year; it is not actual spend. Approvals after 2016 come from the RCA register and carry no investment or exact day. Projects of natural persons are shown without a name.