Projects
Projects with environmental approval
1,452 mining projects with an environmental approval (RCA), out of 2,298 approvals at supervised sites of the sector. Each with its date, instrument, declared investment, company and location.
Projects in this selection
1,452
RCAs from 1992 to 2026
Declared investment
US$ 94,035 M
Sum of the 824 projects that state it, in nominal dollars of each evaluation year
Regions
16
Antofagasta 532 · Atacama 352 · Coquimbo 138
Approvals per year
Number of RCAs in the selection by the year they were issued.
1,452 projects
| Project | Company | Location | Approval | Declared investment | Source |
|---|---|---|---|---|---|
| Modificación de la Lixiviación de Depósitos de Baja Ley Rom IMetallic mining · El Abra | SCM El Abra | AntofagastaCalama | Jul 27, 2007DIA · RCA 224/2007 | US$ 190 k | SMA |
| Mejoramiento Operacional Fundición AltonorteSmelting and refining · Fundición Altonorte | Complejo Metalúrgico Altonorte S.A. | AntofagastaAntofagasta | Jul 23, 2007DIA · RCA 212/2007 | US$ 58.4 M | SMA |
| Modificación Mineroducto Collahuasi Mineroducto CollahuasiMetallic mining · Faena Minera Collahuasi | Compañía Minera Doña Inés de Collahuasi | TarapacáPica, Iquique | Jul 21, 2007DIA · RCA 92/2007 | US$ 38 M | SMA |
| Planta Hidrometalurgica Luz MaríaMetallurgy · Planta Hidrometalurgica Luz María Yacimiento Periquitas - Iquique | — | TarapacáIquique | Jul 21, 2007DIA · RCA 86/2007 | US$ 4 M | SMA |
| Ampliación del Proyecto Mina La JaponesaMetallic mining · Minera Vallenar Iron | Sociedad Contractual Minera Vallenar Iron Company | AtacamaVallenar | Jul 19, 2007DIA · RCA 152/2007 | US$ 12 M | SMA |
| Continuidad Operativa Proyecto Caquicito Continuidad CaquicitoMetallic mining · Proyecto Caquicito | Anglo American Sur | ValparaísoNogales | Jul 10, 2007DIA · RCA 182/2007 | US$ 900 k | SMA |
| Continuidad Operativa Proyecto Caquicito Continuidad CaquicitoMetallic mining · Mina El Soldado | Anglo American Sur | ValparaísoNogales | Jul 10, 2007DIA · RCA 182/2007 | US$ 900 k | SMA |
| Construcción Planta LIX-SX-EW 400 TMF/Mes ENAMIMetallurgy · Planta Matta ENAMI | ENAMI | AtacamaCopiapó | Jul 9, 2007DIA · RCA 128/2007 | US$ 10.8 M | SMA |
| Explotación Sector FortunaMetallic mining · El Peñón | Minera Meridian Limitada | AntofagastaAntofagasta | Jul 4, 2007DIA · RCA 192/2007 | US$ 13 M | SMA |
| Proyecto FrankeMetallic mining · Minera Franke | Sociedad Contractual Minera Franke | AntofagastaTaltal, Diego de Almagro | Jun 28, 2007EIA · RCA 1544/2007 | US$ 100 M | SMA |
| DIA Ampliación y Optimización Faenas Mina El PeñónMetallic mining · El Peñón | Minera Meridian Limitada | AntofagastaAntofagasta | Jun 12, 2007DIA · RCA 163/2007 | US$ 35 M | SMA |
| Incremento de Producción a 140 KT/D - División El TenienteMetallic mining · Mina El Teniente y Fundición Caletones | Codelco | Libertador General Bernardo O'HigginsMachalí, Alhué | Jun 11, 2007DIA · RCA 1214/2007 | — | SMA |
| Proyecto Optimización del Circuito Chancado de PebblesMetallic mining · Candelaria | Minera Candelaria | AtacamaTierra Amarilla | Jun 5, 2007DIA · RCA 106/2007 | US$ 25 M | SMA |
| Modificación Turba Grazzia San JuanNon-metallic mining · Turbera Grazzia San Juan | Sociedad Minera Patagonia Peat S.A. | MagallanesPunta Arenas | May 22, 2007DIA · RCA 72/2007 | US$ 120 k | SMA |
| Proyecto CascadaMetallic mining · Minera Cerro Bayo | Compañía Minera Cerro Bayo Limitada | AysénChile Chico | May 19, 2007DIA · RCA 201/2007 | US$ 55 M | SMA |
| Ampliación Planta SX-EW a 800 TMF/Mes Planta Salado ENAMIMetallurgy · Planta Salado ENAMI | ENAMI | AtacamaChañaral | Apr 30, 2007DIA · RCA 75/2007 | US$ 10.5 M | SMA |
| Explotación de Minerales de Hierro Sector Cerro Negro CristalesMetallic mining · CMP-Cristales | Cía. Mra. del Pacífico S.A. | AtacamaVallenar | Apr 28, 2007DIA · RCA 74/2007 | US$ 3 M | SMA |
| Ampliación Limite Mina de Carbón Bitsch Norte Chabunco S.A. Punta Arenas Ampliación Limite Mina de Carbón BTSCH NorteNon-metallic mining · Mina Bitsch | Chabunco S.A. | MagallanesPunta Arenas | Apr 28, 2007DIA · RCA 66/2007 | US$ 30 k | SMA |
| Lixiviación Dinamica IIMetallurgy · Minera Metálicamantos Blancos (Titular Mantos Cooper) | Mantos Copper S.A. | AntofagastaAntofagasta | Apr 23, 2007DIA · RCA 111/2007 | US$ 1 M | SMA |
| Plan Minero 2007-2010Metallic mining · Dayton | Compañía Minera Dayton Sociedad Contractual Minera | CoquimboAndacollo | Apr 21, 2007DIA · RCA 74/2007 | US$ 700 k | SMA |
| Lixiviación Dinamica San José IIMetallurgy · Minera Metálicamantos Blancos (Titular Mantos Cooper) | Mantos Copper S.A. | AntofagastaAntofagasta | Apr 11, 2007DIA · RCA 94/2007 | US$ 100 k | SMA |
| Proyecto HipogenoMetallic mining · Teck Carmen de Andacollo | Teck Carmen de Andacollo | CoquimboAndacollo | Apr 9, 2007EIA · RCA 104/2007 | US$ 350 M | SMA |
| Proyecto Explotación Depósitos Huinquintipa Este Fases II y IIIMetallic mining · Faena Minera Collahuasi | Compañía Minera Doña Inés de Collahuasi | TarapacáPica | Apr 9, 2007DIA · RCA 46/2007 | US$ 22 M | SMA |
| Prospección Nueva Guanaco Segunda EtapaMetallic mining · Mina Guanaco | Guanaco Compañía Minera Limitada | AntofagastaTaltal | Mar 30, 2007DIA · RCA 87/2007 | US$ 2.1 M | SMA |
| Proyecto Planta CatemuMetallurgy · Planta Catemu | Compañía Minera Amalia Limitada | ValparaísoCatemu | Mar 22, 2007DIA · RCA 89/2007 | US$ 8 M | SMA |
| Ampliación Depósito de Ripios Tranque Nº 4. Minera Sur Andes Ltda. División El SoldadoMetallic mining · Mina El Soldado | Anglo American Sur | ValparaísoNogales | Mar 16, 2007DIA · RCA 70/2007 | US$ 14.9 M | SMA |
| Mejoramiento Tecnologico para la Concentración de Minerales Cupr“feros Mediante Proceso ElectrowiningMetallurgy · Minera Portezuelo | Compañía Minera Portezuela Ltda. | CoquimboIllapel | Feb 28, 2007DIA · RCA 46/2007 | US$ 1.5 M | SMA |
| Ampliación Aguas BlancasNon-metallic mining · Aguas Blancas | Atacama Minerals Chile S.C.M. | AntofagastaAntofagasta | Feb 26, 2007DIA · RCA 54/2007 | US$ 100 M | SMA |
| Proyecto de Explotación Mina CinabrioMetallic mining · Minera BMR (Ex-Altos de Punitaqui) | Minera BMR SpA | CoquimboOvalle | Feb 24, 2007DIA · RCA 34/2007 | — | SMA |
| DIA Sondajes de Prospección y Planta Piloto de Lixiviación. Proyecto RegalitoMetallic mining · Caserones | Minera Lumina Copper Chile Ltda. | AtacamaTierra Amarilla | Feb 14, 2007DIA · RCA 16/2007 | US$ 13.5 M | SMA |
| Procesamiento Polvos con Contenido de CobreMetallurgy · Minera Metálicamantos Blancos (Titular Mantos Cooper) | Mantos Copper S.A. | AntofagastaAntofagasta | Feb 10, 2007DIA · RCA 44/2007 | US$ 250 k | SMA |
| Proyecto Túnel de Prospección Sector ManquehuaMetallic mining · Tres Valles | Sociedad Contractual Minera Tres Valles | CoquimboSalamanca | Feb 3, 2007DIA · RCA 12/2007 | US$ 5 M | SMA |
| Habilitación Canoa BY-Pass de Mantención Cruce Relaves Río CachapoalMetallic mining · Mina El Teniente y Fundición Caletones | Codelco | Libertador General Bernardo O'HigginsRequínoa, Machalí | Jan 29, 2007DIA · RCA 16/2007 | US$ 8.7 M | SMA |
| Mina Nueva Victoria SurNon-metallic mining · Faena Nueva Victoria - SQM | SQM | TarapacáPozo Almonte | Jan 19, 2007DIA · RCA 173/2006 | US$ 2.8 M | SMA |
| Sistema de Tratamiento de Aguas Servidas del Campamento Colón y Obras ComplementariasMetallic mining · Mina El Teniente y Fundición Caletones | Codelco | Libertador General Bernardo O'Higgins | 2006RCA 62/2006 | — | SMA |
| Plan de Cierre Planta N° 1 de Compañía Minera San Esteban Primera S.A.Metallurgy · Planta Metalúrgicacompañia Minera San Esteban | — | Atacama | 2006RCA 36/2006 | — | SMA |
| Continuidad Operativa en el Tratamiento de Polvos de FundiciónMetallurgy · Planta Callejas Zamora | — | Antofagasta | 2006RCA 1407/2006 | — | SMA |
| Estación de Transferencia Bimodal de Cobre Metalico Los LiriosMetallic mining · Mina El Teniente y Fundición Caletones | Codelco | Libertador General Bernardo O'Higgins | 2006RCA 75/2006 | — | SMA |
| Sondajes Cerro NegroMetallic mining · Cerro Negro | Codelco | Antofagasta | 2006RCA 100/2006 | — | SMA |
| Disposición de Neumaticos Mediante Confinamiento en Depósitos de LastreMetallic mining · Codelco Chuquicamata | Codelco | Antofagasta | 2006RCA 113/2006 | — | SMA |
| Utilización de Flitrados de Petroleo en Calentador de AguaMetallic mining · Faena Minera Quebrada Blanca | Teck Quebrada Blanca | Tarapacá | 2006RCA 77/2006 | — | SMA |
| Centro Logistico VallenarMetallic mining · Barrick - Pascua Lama | Compañía Minera Nevada SpA | Atacama | 2006RCA 138/2006 | — | SMA |
| Estación de Combustible Área Mina Petrolera P-3Metallic mining · El Abra | SCM El Abra | Antofagasta | 2006RCA 118/2006 | — | SMA |
| Línea Eléctrica 110 KV Cardones - Planta de Magnetita Línea Eléctrica 110 KV Planta MagnetitaMetallurgy · Planta Metalúrgicamagnetita CMP | Cía. Mra. del Pacífico S.A. | Atacama | 2006RCA 109/2006 | — | SMA |
| Tratamiento de Polvos de Fundición por Lixiviación AcidaMetallurgy · Tratamiento de Residuos Peligrosos en Planta Ecl | EcoMetales Limited | Antofagasta | 2006RCA 149/2006 | — | SMA |
| Loteo BarquitoMetallic mining · Codelco Salvador - Potrerillos | Codelco | Atacama | 2006RCA 140/2006 | — | SMA |
| Planta de Reciclaje de Aceites Usados para Uso en TronaduraMetallic mining · El Abra | SCM El Abra | Antofagasta | 2006RCA 173/2006 | — | SMA |
| Planta de Tratamiento de Residuos SolidosMetallic mining · Minera Centinela | Minera Centinela | Antofagasta | 2006RCA 251/2006 | — | SMA |
| Proyecto Traslado Puntos de Captación de Aguas Subterraneas en Cuenca CoposaMetallic mining · Faena Minera Collahuasi | Compañía Minera Doña Inés de Collahuasi | Tarapacá | 2006RCA 144/2006 | — | SMA |
| D.I.A. Voluntaria Proyecto Camino de Enlace Mina Verdun/Planta CatemuMetallic mining · Proyecto Minero Uva | Soc. Exploración y Desarrollo Minero (Explodesa) | Valparaíso | 2006RCA 480/2006 | — | SMA |
Source: public registers of Chile's environmental regulator (SMA). Investment is what the holder declared when the project was assessed, in dollars of that year; it is not actual spend. Approvals after 2016 come from the RCA register and carry no investment or exact day. Projects of natural persons are shown without a name.