Chile's copper output, April 2017

Chile produced 420.1 kt of fine mine copper in April 2017. That is 2.69% less than in April 2016 (431.8 kt). In the 4 months to April 2017 it adds up to 1,612.2 kt, 11.73% less than in the same period a year earlier.

The 33 operations the table details produced 408.1 kt, 97.14% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • It is the lowest April of the series, which starts in 2014.
  • 4 months in a row below the same month a year earlier.
  • In the twelve months to April 2017 the country adds up to 5,338.4 kt, 6.18% less than in the twelve before.
  • Los Pelambres: its lowest month since February 2015, at 24.9 kt. Cochilco
  • Ministro Hales: its lowest month since February 2015, at 15.5 kt. Cochilco
  • El Abra: its lowest month of its series, which starts in January 2014, at 5.6 kt. Cochilco

Chile's mine copper, April 2017

420.1 kt

2.69%against April 2016Cochilco

January to April 2017

1,612.2 kt

11.73%against the same period of 2016

Copper price, average of the month (LME)

258.4 ¢/lb

17.45%against April 2016Cochilco

Who rose and who fell

Added the most

In tonnes, against April 2016.

  1. El Teniente+9.6 ktfrom 25.9 to 35.5Cochilco
  2. Andina+6.6 ktfrom 12 to 18.6Cochilco
  3. Spence+6.2 ktfrom 10.7 to 16.9Cochilco
  4. Candelaria+6.1 ktfrom 9.4 to 15.5Cochilco
  5. Centinela Sulfuros+4.4 ktfrom 9.6 to 14Cochilco

Lost the most

In tonnes, against April 2016.

  1. Escondida−24.1 ktfrom 88.1 to 64Cochilco
  2. Los Pelambres−7.9 ktfrom 32.8 to 24.9Cochilco
  3. Ministro Hales−3.7 ktfrom 19.2 to 15.5Cochilco
  4. Collahuasi−2.9 ktfrom 34 to 31.1Cochilco
  5. El Abra−2.5 ktfrom 8.1 to 5.6Cochilco

Operation by operation, April 2017

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationApril 20172016ChangeYear to date 2017ChangeShare of totalSource
1Escondida6488.127.36%161.154.45%15.23%Cochilco
2El Teniente35.525.937.07%13710.87%8.45%Cochilco
3Collahuasi31.1348.53%162.17.99%7.4%Cochilco
4Los Bronces29.92615.18%105.84.82%7.12%Cochilco
5Radomiro Tomic2726.22.72%101.67.44%6.42%Cochilco
6Los Pelambres24.932.824.09%110.86.02%5.93%Cochilco
7Chuquicamata22.924.56.73%7616.25%5.44%Cochilco
8Andina18.61255%76.319.78%4.43%Cochilco
9Spence16.910.757.94%66.331.29%4.02%Cochilco
10Candelaria15.59.464.89%47.18.28%3.69%Cochilco
11Ministro Hales15.519.219.27%77.55.72%3.69%Cochilco
12Centinela Sulfuros149.645.83%5313.25%3.33%Cochilco
13Caserones10.48.818.18%45.326.89%2.48%Cochilco
14Gabriela Mistral9.710.35.83%377.27%2.31%Cochilco
15Zaldívar8.29.19.89%34.92.95%1.95%Cochilco
16Sierra Gorda7.47.31.37%34.12.01%1.76%Cochilco
17Antucoya6.95.232.69%27.252.81%1.64%Cochilco
18Lomas Bayas6.76.81.47%277.14%1.59%Cochilco
19Cerro Colorado6.48.221.95%23.118.09%1.52%Cochilco
20El Abra5.68.130.86%2531.51%1.33%Cochilco
21Carmen de Andacollo5.15.45.56%25.59.44%1.21%Cochilco
22Salvador54.76.38%18.56.09%1.19%Cochilco
23Centinela Óxidos3.94.411.36%20.420%0.93%Cochilco
24Mantoverde3.74.619.89%12.829.94%0.87%Cochilco
25Mantos Blancos3.63.72.72%14.59.18%0.87%Cochilco
26El Soldado2.2445.64%11.221.16%0.52%Cochilco
27Ojos del Salado (Lundin)220%8.22.5%0.48%Cochilco
28Quebrada Blanca1.92.934.48%8.824.79%0.45%Cochilco
29Franke1.51.47.14%6.20%0.36%Cochilco
30Atacama Kozan1.3130%4.22.33%0.31%Cochilco
31Tres Valles0.50.50%1.95.56%0.12%Cochilco
32Cerro Negro0.30.538.71%1.237.66%0.07%Cochilco
33Pampa Camarones (mina y planta de cátodos)0.10.376.36%0.378.02%0.02%Cochilco
Total of 33 operations408.1417.62.28%1,561.911.73%97.14%
Other producers, not detailed in the table1214.114.85%50.311.55%2.86%
Chile total420.1431.82.69%1,612.211.73%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.