Skip to content

Monthly report

Chile's copper output, July 2025

Chile produced 441.6 kt of fine mine copper in July 2025. That is 0.21% more than in July 2024 (440.7 kt). In the 7 months to July 2025 it adds up to 3,098.5 kt, 2.35% more than in the same period a year earlier.

The 34 operations the table details produced 431.6 kt, 97.72% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • It is the highest July since 2021.
  • In the twelve months to July 2025 the country adds up to 5,577.1 kt, 4.88% more than in the twelve before.
  • Spence: its lowest month since December 2021, at 14.4 kt. Cochilco
  • El Abra: its lowest month since May 2023, at 7 kt. Cochilco
  • Salvador: its highest month since December 2021, at 4.3 kt. Cochilco
  • Michilla: its lowest month since February 2023, at 1.4 kt. Cochilco

Chile's mine copper, July 2025

441.6 kt

0.21%against July 2024Cochilco

January to July 2025

3,098.5 kt

2.35%against the same period of 2024

Copper price, average of the month (LME)

443.5 ¢/lb

4.09%against July 2024Cochilco

Who rose and who fell

Added the most

In tonnes, against July 2024.

  1. Ministro Hales+11.1 ktfrom 3.7 to 14.8Cochilco
  2. Escondida+8.3 ktfrom 106.5 to 114.8Cochilco
  3. Centinela Sulfuros+6 ktfrom 8 to 14Cochilco
  4. Salvador+4.3 ktfrom 0 to 4.3Cochilco
  5. El Teniente+4 ktfrom 26.5 to 30.5Cochilco

Lost the most

In tonnes, against July 2024.

  1. Collahuasi−12.8 ktfrom 47 to 34.2Cochilco
  2. Chuquicamata−8.8 ktfrom 25.8 to 17.1Cochilco
  3. Spence−5.8 ktfrom 20.1 to 14.4Cochilco
  4. Gabriela Mistral−3.7 ktfrom 9.9 to 6.3Cochilco
  5. Centinela Óxidos−3.1 ktfrom 9 to 5.9Cochilco

Operation by operation, July 2025

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationJuly 20252024ChangeYear to date 2025ChangeShare of totalSource
1Escondida114.8106.57.81%794.910.27%25.99%Cochilco
2Collahuasi34.24727.14%223.732.42%7.75%Cochilco
3El Teniente30.526.515.22%202.615.74%6.91%Cochilco
4Los Pelambres25.126.76.28%173.77.77%5.67%Cochilco
5Radomiro Tomic23.822.84.52%163.18.71%5.4%Cochilco
6Quebrada Blanca18.11520.46%113.13.12%4.1%Cochilco
7Chuquicamata17.125.833.89%132.410.86%3.87%Cochilco
8Ministro Hales14.83.7295.46%81.6107.39%3.35%Cochilco
9Spence14.420.128.64%155.74.18%3.25%Cochilco
10Centinela Sulfuros14874.69%94.382.67%3.17%Cochilco
11Andina1315.314.82%97.511.21%2.95%Cochilco
12Los Bronces12.7131.84%93.115.5%2.88%Cochilco
13Sierra Gorda12.211.46.78%92.615.21%2.76%Cochilco
14Caserones11.89.524.55%69.84.98%2.68%Cochilco
15Candelaria10.112.217.53%73.47.81%2.29%Cochilco
16Mantoverde7.85.150.86%55.3136.87%1.76%Cochilco
17El Abra7812.51%58.11.75%1.58%Cochilco
18Gabriela Mistral6.39.936.97%45.126.34%1.42%Cochilco
19Antucoya6.26.77.68%45.72.83%1.4%Cochilco
20Centinela Óxidos5.9934.55%41.828.52%1.34%Cochilco
21Mantos Blancos4.92.594.61%34.546.62%1.1%Cochilco
22Lomas Bayas4.85.613.87%34.819.24%1.08%Cochilco
23Carmen de Andacollo4.44.23.9%26.739.37%0.99%Cochilco
24Salvador4.30—21.4—0.98%Cochilco
25Zaldívar4.36.432.93%3718.57%0.97%Cochilco
26El Soldado4.13.79.56%267.53%0.92%Cochilco
27Michilla1.41.59.71%10.215.38%0.31%Cochilco
28Atacama Kozan1.11.25.22%6.71.61%0.26%Cochilco
29Ojos del Salado (Lundin)110.97%9.238.01%0.23%Cochilco
30Franke0.90.94.66%6.58.08%0.21%Cochilco
31Cerro Negro0.30.428.98%2.210.86%0.06%Cochilco
32Pampa Camarones (mina y planta de cátodos)0.20.434.99%1.935.61%0.06%Cochilco
33Tres Valles0.10.14.07%0.725.32%0.03%Cochilco
34Cerro Colorado00—0—0%Cochilco
Total of 34 operations431.6430.30.28%3,025.22.52%97.72%
Other producers, not detailed in the table10.110.42.93%73.34.11%2.28%
Chile total441.6440.70.21%3,098.52.35%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.