Skip to content

Monthly report

Chile's copper output, April 2026

Chile produced 396.9 kt of fine mine copper in April 2026. That is 13.84% less than in April 2025 (460.7 kt). In the 4 months to April 2026 it adds up to 1,613.6 kt, 7.89% less than in the same period a year earlier.

The 34 operations the table details produced 386.2 kt, 97.3% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • It is the lowest April of the series, which starts in 2014.
  • 9 months in a row below the same month a year earlier.
  • In the twelve months to April 2026 the country adds up to 5,250 kt, 5.66% less than in the twelve before.
  • Chuquicamata: its lowest month of its series, which starts in January 2014, at 10.6 kt. Cochilco
  • Sierra Gorda: its lowest month since April 2024, at 10.5 kt. Cochilco
  • Lomas Bayas: its lowest month of its series, which starts in January 2014, at 2.5 kt. Cochilco

Chile's mine copper, April 2026

396.9 kt

13.84%against April 2025Cochilco

January to April 2026

1,613.6 kt

7.89%against the same period of 2025

Copper price, average of the month (LME)

584.7 ¢/lb

40.24%against April 2025Cochilco

Who rose and who fell

Added the most

In tonnes, against April 2025.

  1. Los Bronces+2.9 ktfrom 12.3 to 15.2Cochilco
  2. Quebrada Blanca+2.5 ktfrom 16.7 to 19.2Cochilco
  3. Andina+2.2 ktfrom 11.9 to 14.1Cochilco
  4. Radomiro Tomic+2 ktfrom 24.1 to 26.1Cochilco
  5. Zaldívar+1.7 ktfrom 5.1 to 6.7Cochilco

Lost the most

In tonnes, against April 2025.

  1. Escondida−28.2 ktfrom 128.4 to 100.2Cochilco
  2. El Teniente−11.1 ktfrom 31.1 to 20Cochilco
  3. Chuquicamata−7.7 ktfrom 18.4 to 10.6Cochilco
  4. Collahuasi−5.8 ktfrom 36.6 to 30.7Cochilco
  5. Los Pelambres−4.1 ktfrom 24.9 to 20.8Cochilco

Operation by operation, April 2026

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationApril 20262025ChangeYear to date 2026ChangeShare of totalSource
1Escondida100.2128.421.94%411.812.7%25.25%Cochilco
2Collahuasi30.736.615.94%1191.89%7.74%Cochilco
3Radomiro Tomic26.124.18.28%97.711.27%6.58%Cochilco
4Los Pelambres20.824.916.45%90.47.74%5.24%Cochilco
5El Teniente2031.135.68%79.128.88%5.03%Cochilco
6Quebrada Blanca19.216.714.78%74.726.64%4.84%Cochilco
7Spence16.920.517.37%61.530.42%4.26%Cochilco
8Los Bronces15.212.323.46%63.714.49%3.82%Cochilco
9Andina14.111.918.76%56.60.63%3.55%Cochilco
10Centinela Sulfuros12.613.78.18%48.32.47%3.17%Cochilco
11Chuquicamata10.618.442.16%54.218.99%2.68%Cochilco
12Sierra Gorda10.51212.51%49.93.18%2.65%Cochilco
13Caserones10.2913.37%48.729.29%2.57%Cochilco
14Candelaria8.512.129.97%36.118.03%2.13%Cochilco
15Mantoverde8.27.311.73%27.28.91%2.06%Cochilco
16El Abra88.44.03%30.115.89%2.02%Cochilco
17Ministro Hales7.910.423.47%34.819.28%2%Cochilco
18Gabriela Mistral7.16.67.53%23.38.3%1.79%Cochilco
19Antucoya6.96.310.64%26.50.37%1.74%Cochilco
20Zaldívar6.75.132.95%23.92.26%1.69%Cochilco
21Centinela Óxidos4.56.125.86%17.532.3%1.15%Cochilco
22Mantos Blancos4.25.422.09%16.514.21%1.05%Cochilco
23Carmen de Andacollo44.919.17%17.90.38%1.01%Cochilco
24Salvador3.33.15.67%1556.64%0.84%Cochilco
25El Soldado3424.28%12.611.39%0.76%Cochilco
26Lomas Bayas2.55.252.94%16.422.38%0.62%Cochilco
27Michilla1.21.626.98%4.328.12%0.29%Cochilco
28Atacama Kozan0.80.912.57%322.44%0.2%Cochilco
29Franke0.7126.45%3.115.33%0.19%Cochilco
30Ojos del Salado (Lundin)0.71.964.08%2.851.29%0.17%Cochilco
31Cerro Negro0.40.313.91%1.45.1%0.1%Cochilco
32Pampa Camarones (mina y planta de cátodos)0.30.219.83%1.317.72%0.07%Cochilco
33Tres Valles0.10.118.45%0.892.61%0.03%Cochilco
34Cerro Colorado00—0—0%Cochilco
Total of 34 operations386.2450.314.25%1,570.38.13%97.3%
Other producers, not detailed in the table10.710.33.79%43.32.07%2.7%
Chile total396.9460.713.84%1,613.67.89%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.