Monthly report

Chile's copper output, October 2025

Chile produced 455.8 kt of fine mine copper in October 2025. That is 6.77% less than in October 2024 (488.9 kt). In the 10 months to October 2025 it adds up to 4,427.4 kt, 0.69% less than in the same period a year earlier.

The 34 operations the table details produced 444.4 kt, 97.49% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • It is the lowest October since 2016.
  • 3 months in a row below the same month a year earlier.
  • In the twelve months to October 2025 the country adds up to 5,475.2 kt, 1.49% more than in the twelve before.
  • Centinela Sulfuros: its highest month since August 2019, at 17.2 kt. Cochilco
  • Carmen de Andacollo: its highest month since March 2020, at 5.3 kt. Cochilco

Chile's mine copper, October 2025

455.8 kt

6.77%against October 2024Cochilco

January to October 2025

4,427.4 kt

0.69%against the same period of 2024

Copper price, average of the month (LME)

485.2 ¢/lb

12.13%against October 2024Cochilco

Who rose and who fell

Added the most

In tonnes, against October 2024.

  1. Escondida+12.6 ktfrom 108 to 120.6Cochilco
  2. Centinela Sulfuros+2.3 ktfrom 14.9 to 17.2Cochilco
  3. Los Bronces+2.2 ktfrom 12 to 14.3Cochilco
  4. Radomiro Tomic+2.1 ktfrom 21.5 to 23.6Cochilco
  5. Salvador+1.7 ktfrom 1.7 to 3.4Cochilco

Lost the most

In tonnes, against October 2024.

  1. Collahuasi−14.5 ktfrom 49.5 to 35Cochilco
  2. El Teniente−13.3 ktfrom 36 to 22.7Cochilco
  3. Candelaria−6.4 ktfrom 16.6 to 10.2Cochilco
  4. Chuquicamata−4.5 ktfrom 24.8 to 20.3Cochilco
  5. El Abra−3.4 ktfrom 9.7 to 6.3Cochilco

Operation by operation, October 2025

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationOctober 20252024ChangeYear to date 2025ChangeShare of totalSource
1Escondida120.610811.7%1,139.29.99%26.46%Cochilco
2Collahuasi3549.529.33%332.230.91%7.68%Cochilco
3Los Pelambres26.930.110.56%252.47.84%5.91%Cochilco
4Radomiro Tomic23.621.59.53%237.89.06%5.18%Cochilco
5El Teniente22.73636.9%2578.68%4.98%Cochilco
6Spence20.522.69%217.72.66%4.51%Cochilco
7Chuquicamata20.324.818.03%189.913.53%4.46%Cochilco
8Centinela Sulfuros17.214.915.28%142.758.29%3.77%Cochilco
9Quebrada Blanca16.916.42.94%151.47.38%3.7%Cochilco
10Los Bronces14.31218.4%136.46.45%3.13%Cochilco
11Ministro Hales13.213.84.29%118.550.97%2.9%Cochilco
12Sierra Gorda12.512.92.97%135.710.41%2.74%Cochilco
13Andina12.312.72.46%139.88.17%2.71%Cochilco
14Caserones10.9108.89%104.21.25%2.39%Cochilco
15Candelaria10.216.638.7%106.19.06%2.24%Cochilco
16Antucoya7.36.95.74%65.41.68%1.61%Cochilco
17Gabriela Mistral7.39.422.81%66.123.61%1.59%Cochilco
18Zaldívar6.97.47.2%58.113.38%1.51%Cochilco
19El Abra6.39.734.74%776.78%1.39%Cochilco
20Mantos Blancos64.534.69%51.143.98%1.32%Cochilco
21Mantoverde5.96.35.82%77.283.98%1.3%Cochilco
22Lomas Bayas5.66.411.67%49.619.31%1.23%Cochilco
23Carmen de Andacollo5.34.96.67%40.628.93%1.16%Cochilco
24Centinela Óxidos4.67.941.38%56.532.29%1.01%Cochilco
25Salvador3.41.7100.24%30.81,727.55%0.74%Cochilco
26El Soldado2.84.234.07%35.710.47%0.61%Cochilco
27Michilla1.61.50.65%14.214.39%0.34%Cochilco
28Ojos del Salado (Lundin)1.31.720.68%12.712%0.29%Cochilco
29Atacama Kozan11.217.42%9.72.34%0.22%Cochilco
30Franke0.81.227.44%9.210.71%0.18%Cochilco
31Cerro Negro0.40.46.67%3.34.92%0.08%Cochilco
32Pampa Camarones (mina y planta de cátodos)0.40.313.94%2.928.17%0.08%Cochilco
33Tres Valles0.30.1129.36%1.23.39%0.05%Cochilco
34Cerro Colorado00—0—0%Cochilco
Total of 34 operations444.4477.66.95%4,322.20.61%97.49%
Other producers, not detailed in the table11.411.40.68%105.23.98%2.51%
Chile total455.8488.96.77%4,427.40.69%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.