Chile's copper output, February 2026

Chile produced 375.4 kt of fine mine copper in February 2026. That is 4.84% less than in February 2025 (394.5 kt). In the 2 months to February 2026 it adds up to 785.3 kt, 3.9% less than in the same period a year earlier.

The 34 operations the table details produced 365.2 kt, 97.28% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • It is the lowest February since 2017.
  • 7 months in a row below the same month a year earlier.
  • In the twelve months to February 2026 the country adds up to 5,356.3 kt, 2.1% less than in the twelve before.
  • Spence: its lowest month since January 2021, at 12 kt. Cochilco
  • Andina: its lowest month since April 2023, at 8.9 kt. Cochilco
  • Gabriela Mistral: its lowest month of its series, which starts in January 2014, at 3.7 kt. Cochilco

Chile's mine copper, February 2026

375.4 kt

4.84%against February 2025Cochilco

January to February 2026

785.3 kt

3.9%against the same period of 2025

Copper price, average of the month (LME)

588.2 ¢/lb

39%against February 2025Cochilco

Who rose and who fell

Added the most

In tonnes, against February 2025.

  1. Collahuasi+9.7 ktfrom 17 to 26.6Cochilco
  2. Los Bronces+3.3 ktfrom 11.9 to 15.2Cochilco
  3. Quebrada Blanca+2.7 ktfrom 14.1 to 16.8Cochilco
  4. Caserones+2.3 ktfrom 9.3 to 11.6Cochilco
  5. Salvador+2.2 ktfrom 1.5 to 3.7Cochilco

Lost the most

In tonnes, against February 2025.

  1. Escondida−8.4 ktfrom 113.4 to 105Cochilco
  2. Spence−8.1 ktfrom 20.1 to 12Cochilco
  3. Andina−5.5 ktfrom 14.4 to 8.9Cochilco
  4. El Teniente−5.4 ktfrom 27 to 21.6Cochilco
  5. Centinela Sulfuros−4.6 ktfrom 12 to 7.4Cochilco

Operation by operation, February 2026

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationFebruary 20262025ChangeYear to date 2026ChangeShare of totalSource
1Escondida105113.47.37%2105.74%27.98%Cochilco
2Collahuasi26.61756.93%56.826.31%7.1%Cochilco
3Los Pelambres22.922.51.81%41.99.87%6.11%Cochilco
4El Teniente21.62720.13%39.724.69%5.74%Cochilco
5Radomiro Tomic1918.62.15%44.111.59%5.06%Cochilco
6Quebrada Blanca16.814.119.18%34.353.4%4.47%Cochilco
7Los Bronces15.211.928.17%313.3%4.05%Cochilco
8Chuquicamata1413.72.26%27.53.11%3.72%Cochilco
9Spence1220.140.29%28.436.45%3.2%Cochilco
10Caserones11.69.325.03%2530.47%3.1%Cochilco
11Sierra Gorda11.5123.65%24.50.89%3.07%Cochilco
12Candelaria9.510.48.27%19.94.17%2.54%Cochilco
13Ministro Hales99.10.57%1811.18%2.41%Cochilco
14Andina8.914.437.98%24.713.28%2.38%Cochilco
15Centinela Sulfuros7.41238.42%21.43.89%1.96%Cochilco
16El Abra6.88.116.64%14.220.13%1.81%Cochilco
17Mantoverde6.56.24.92%11.126.12%1.72%Cochilco
18Antucoya5.76.16.55%12.82.67%1.52%Cochilco
19Lomas Bayas4.34.14.52%9.211.36%1.15%Cochilco
20Carmen de Andacollo4.348.34%9.39.73%1.15%Cochilco
21Centinela Óxidos4633.26%8.732.23%1.07%Cochilco
22Zaldívar45.526.8%11.55.32%1.06%Cochilco
23Mantos Blancos3.942.4%8.52.8%1.03%Cochilco
24Salvador3.71.5150.71%7.7223.32%0.98%Cochilco
25Gabriela Mistral3.75.331.34%9.125.12%0.97%Cochilco
26El Soldado3.13.817.06%6.315.31%0.84%Cochilco
27Michilla11.425.79%229.74%0.28%Cochilco
28Atacama Kozan0.80.86.13%1.611.41%0.21%Cochilco
29Franke0.70.88.34%1.72.6%0.2%Cochilco
30Ojos del Salado (Lundin)0.71.241.6%1.443.87%0.18%Cochilco
31Pampa Camarones (mina y planta de cátodos)0.30.242.04%0.724.55%0.09%Cochilco
32Cerro Negro0.30.314.43%0.65.46%0.07%Cochilco
33Tres Valles0.20.1100.96%0.5138.12%0.06%Cochilco
34Cerro Colorado00—0—0%Cochilco
Total of 34 operations365.2384.75.08%764.14.05%97.28%
Other producers, not detailed in the table10.29.84.53%21.31.65%2.72%
Chile total375.4394.54.84%785.33.9%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.