Chile's copper output, February 2025

Chile produced 394.5 kt of fine mine copper in February 2025. That is 5.58% less than in February 2024 (417.8 kt). In the 2 months to February 2025 it adds up to 817.2 kt, 4.12% less than in the same period a year earlier.

The 34 operations the table details produced 384.7 kt, 97.52% of the total; the rest comes from producers the table does not break down by operation.

What stands out

  • In the twelve months to February 2025 the country adds up to 5,470.9 kt, 3.4% more than in the twelve before.
  • Collahuasi: its lowest month of its series, which starts in January 2014, at 17 kt. Cochilco
  • Zaldívar: its lowest month of its series, which starts in January 2014, at 5.5 kt. Cochilco
  • Gabriela Mistral: its lowest month since March 2021, at 5.3 kt. Cochilco
  • Michilla: its lowest month since February 2023, at 1.4 kt. Cochilco

Chile's mine copper, February 2025

394.5 kt

5.58%against February 2024Cochilco

January to February 2025

817.2 kt

4.12%against the same period of 2024

Copper price, average of the month (LME)

423.2 ¢/lb

12.26%against February 2024Cochilco

Who rose and who fell

Added the most

In tonnes, against February 2024.

  1. Escondida+15.8 ktfrom 97.5 to 113.4Cochilco
  2. Mantoverde+3.4 ktfrom 2.8 to 6.2Cochilco
  3. Centinela Sulfuros+2.8 ktfrom 9.2 to 12Cochilco
  4. Ministro Hales+2.3 ktfrom 6.8 to 9.1Cochilco
  5. Carmen de Andacollo+1.7 ktfrom 2.2 to 4Cochilco

Lost the most

In tonnes, against February 2024.

  1. Collahuasi−28.2 ktfrom 45.2 to 17Cochilco
  2. Radomiro Tomic−5.4 ktfrom 24 to 18.6Cochilco
  3. Los Pelambres−5 ktfrom 27.5 to 22.5Cochilco
  4. Los Bronces−3.9 ktfrom 15.8 to 11.9Cochilco
  5. Gabriela Mistral−2.5 ktfrom 7.8 to 5.3Cochilco

Operation by operation, February 2025

Thousand tonnes of fine copper at 100% of each operation. Every row links to its source.

OperationFebruary 20252024ChangeYear to date 2025ChangeShare of totalSource
1Escondida113.497.516.25%222.814.22%28.74%Cochilco
2El Teniente2725.94.04%52.70.39%6.84%Cochilco
3Los Pelambres22.527.518.2%46.516.44%5.71%Cochilco
4Spence20.119.24.67%44.711.35%5.09%Cochilco
5Radomiro Tomic18.62422.58%39.521.62%4.72%Cochilco
6Collahuasi1745.262.44%4553.78%4.3%Cochilco
7Andina14.416.412.43%28.511.05%3.65%Cochilco
8Quebrada Blanca14.1140.61%22.319.41%3.57%Cochilco
9Chuquicamata13.71614.52%26.718.94%3.46%Cochilco
10Centinela Sulfuros129.230.56%22.243.62%3.03%Cochilco
11Sierra Gorda1211.17.4%24.319.95%3.03%Cochilco
12Los Bronces11.915.824.96%302.65%3.01%Cochilco
13Candelaria10.49.85.7%20.83.5%2.63%Cochilco
14Caserones9.39.74.05%19.214.98%2.36%Cochilco
15Ministro Hales9.16.832.9%20.391.04%2.31%Cochilco
16El Abra8.17.113.82%17.811.56%2.06%Cochilco
17Mantoverde6.22.8121.24%15.1143.85%1.56%Cochilco
18Antucoya6.16.32.74%13.20.62%1.55%Cochilco
19Centinela Óxidos67.115.85%12.914.7%1.53%Cochilco
20Zaldívar5.56.312.99%12.13.78%1.38%Cochilco
21Gabriela Mistral5.37.831.89%12.227.52%1.35%Cochilco
22Lomas Bayas4.15.727.79%10.415.47%1.05%Cochilco
23Carmen de Andacollo42.277.82%8.493.66%1.01%Cochilco
24Mantos Blancos43.610.94%8.716.82%1.01%Cochilco
25El Soldado3.83.73.72%7.413.31%0.96%Cochilco
26Salvador1.50—2.4—0.37%Cochilco
27Michilla1.41.820.18%2.918.11%0.35%Cochilco
28Ojos del Salado (Lundin)1.2123.18%2.525.52%0.3%Cochilco
29Atacama Kozan0.8113.2%1.811.25%0.21%Cochilco
30Franke0.81.124.46%1.722.14%0.2%Cochilco
31Cerro Negro0.30.414.8%0.77.57%0.08%Cochilco
32Pampa Camarones (mina y planta de cátodos)0.20.437.18%0.633.17%0.06%Cochilco
33Tres Valles0.10.128.28%0.229.86%0.03%Cochilco
34Cerro Colorado00—0—0%Cochilco
Total of 34 operations384.7406.65.39%796.33.82%97.52%
Other producers, not detailed in the table9.811.212.41%20.914.41%2.48%
Chile total394.5417.85.58%817.24.12%100%Cochilco

The figures are those of Cochilco's monthly table of mine copper output by company, in kt and at 100% of each operation. Chile's total is the one the table prints. The sum of the operations, what is left for the other producers, the year-to-date figures and the changes are our own sums and differences on those figures. The sentences of this report are assembled from them: no language model is involved.